Ongoing Projects

BAHRAIN INTERNATIONAL AIRPORT ACCESS IMPROVEMENT

The project (Stage-3, Phase-1) involves the transformation of Arad Highway through the Falcon Interchange, including reclamation for a new 398m dual-carriageway flyover connecting Arad Highway and Khalifa Al Khabeer Highway, a new bridge over Arab Bay, and associated works like pedestrian ramps, road markings, safety and noise barriers, landscaping, ITS, utility diversions, storm drainage, and street lighting.

Scope of Work:

  • Reclamation works
  • Road works (signage & marking)
  • Left-turn flyover (BR A1)
  • Demolition of culvert & new bridge (BR C1)
  • Safety & noise barriers
  • Landscaping
  • ITS & utility PR

AL RAFFA LAND DEVELOPMENT

The Al Raffa Land Development Phase-1 project spans approximately 102 hectares, located between Sheikh Khalifa Bin Salman Highway (west) and Zallaq Highway (southeast) in Bahrain's Southern Governorate. Phase 2 (Block 947) focuses on Boulevard Road infrastructure.

Scope of Work:

  • Road works
  • Road signs and markings
  • Stormwater network, lifting station & detention pond
  • Foul sewer network
  • Potable water network
  • Irrigation network
  • Electrical substations & distribution (MV & LV)
  • Street lighting, traffic signals & telecom